- Home
- Metal Working
- CNC Machining
CNC Machining
CNC Machining
Solutions
Shensin Precision Co., Ltd. offers comprehensive CNC machining solutions, including carbon fiber processing, four-axis surface machining, and precision milling, providing end-to-end services from design to finished products for high precision and cost efficiency across industries.
Professional Technologies
- Four-axis CNC surface machining (high-precision complex surfaces)
- CNC computer milling (automated multi-axis control)
- Carbon fiber composite processing (lightweight structure forming)
- Integrated milling secondary processes (drilling, tapping, grinding)
Processing Materials
- Carbon fiber composites
- Aluminum alloys (AL6061, AL7075)
- Stainless steel (SUS304, SUS316)
- Engineering plastics (ABS, PC, PEEK)
- Titanium alloys and copper
Processing Range
- Machining size: Max. 2000mm × 1000mm
- Tolerance: ±0.01mm and up
- Min. surface radius: R0.5mm
- Batch: Single prototyping to medium-volume production
Application
Range
Range
Automotive parts, medical device components, aerospace structures, instrument housings, toy mechanisms, machine equipment assemblies
01
Automotive partsDomestic automotive parts manufacturer custom carbon fiber lightweight components
02
Aerospace structuresMedical equipment supplier precision aerospace-grade instrument parts
03
Machine equipment assembliesToy and machinery industry clients batch CNC structural components
Custom Process
- 01Requirement Consultation
- Confirm part drawings and specs
- 02Design Optimization
- Select best machining method based on material
- 03CNC Machining
- Four-axis surface and milling precision cutting
- 04Secondary Treatment
- Drilling, grinding, and surface finishing
- 05Quality Inspection
- Dimensional verification and functional testing
- 06Delivery
- Packaging and logistics tracking
Q&A
Q1 : Can you support small-batch customization?
A1:Yes, from single prototyping to medium-volume production—no MOQ.
Q2 : How long for carbon fiber processing?
A2:Standard parts: 5–7 days; complex surfaces: 10–15 days (depending on design and quantity).
Q3 : How to reduce costs?
A3:Select optimal machines and methods based on part characteristics to save time and materials.
guwdan@gmail.com